Location: Cambridge, ON
Client’s Name: Stephen
Project Summary:
For this main floor renovation, the tile and carpet were removed and replaced with engineered hardwood and 5″ colonial baseboard. The carpet was also removed on the stairs, the stairs were capped with engineered hardwood and the bannister was stained to match. A white fireplace unit with MDF Michigan shaker style doors was installed in the living room and the main floor was painted white.
Project Included:
2021